Methodology

Spillway measures how much Scottish wind generation the grid operator pays to switch off, where it happens, and what it costs. Every figure is computed from public settlement data by deterministic code, then checked against an independent source before it's published.

Data sources

Contains BMRS data © Elexon Limited copyright and database right 2026 (BMRS licence). Supported by National Energy SO Open Data (NESO Open Data Licence).

Definitions

Why some payments are negative

Each generator sets its own bid price. Many older wind farms earn subsidy per MWh generated, so they bid negative prices: the grid pays them to stop. Some newer farms on Contracts for Difference bid positive prices instead, which means they pay the grid when they're turned down. Both show up as curtailed energy; only the first shows up as a payment to the farm.

Grid boundaries

Power can only flow south as fast as the transmission lines allow. This tracker groups Scottish sites around two major transmission boundaries: B4, between the north of Scotland and the Central Belt, and B6, between Scotland and England. Connection location matters, but broad reporting zones do not establish that a particular site can relieve a particular constraint.

Each wind unit is assigned a zone using Elexon's region code where it has one, and the wind farm's location otherwise. These assignments are provisional until checked against grid connection records; the tracker shows how many are verified.

Checks before publishing

Limitations